Fence quote template: what to include so you get paid

2026-07-20

A fence quote does two jobs. It wins the work, and it settles the argument before the argument happens. Most quotes do the first badly and the second not at all. Here is a fence quote template that covers both, section by section, with the language that keeps you out of trouble.

1. Your business header

Top of the page, no hunting:

  • Business name, phone, email
  • License number if your state requires one
  • Quote number and date
  • Expiry date ("valid for 30 days")

The license line matters more than contractors think. On a residential bid it is the fastest trust signal you have, and in licensed states a quote without it looks amateur.

2. Customer and job address

Both, and separately. The billing customer is not always the property. If the job address differs from the customer's address, list it: it prevents the "I thought you meant the rental" conversation.

3. Scope, in the customer's words

One short paragraph before the line items: what you are building, where, in what material and height.

"Install approximately 148 linear feet of 6 ft cedar privacy fence along the north and west property lines, including one 4 ft walk gate on the north side. Remove and haul away the existing panel fence."

That paragraph is the scope of work. Everything not in it is a change order.

4. The line items

This is the heart of the fence quote template. Break it out; never give one blended number:

Line Unit Why separate
Fence run, by type and height per linear foot The customer can compare materials
Each gate flat, installed Gates cost more than fence; hide them and you eat the labor
Tear-out of existing fence per linear foot Removal is real labor
Haul-away flat Dump fees are real money
Rocky soil / hard digging per post Only charged when it applies
Hardware upgrades each Self-closing hinges, pool-code latches

Then subtotal, materials markup, tax, and total. A customer who can see the parts argues about the price far less than one who sees a single number.

5. The deposit line

State the deposit as an amount and a percentage: "Deposit to schedule: $1,458.00 (30%)". Then say what it does: it books the slot and buys material. A deposit line that explains itself gets paid faster than one that just appears.

6. Terms that actually protect you

The section most quotes skip. Keep it short and specific to fencing:

  • Property lines and survey. You install where the customer directs; you are not a surveyor. If the line is disputed, that is on the owner.
  • Utility locates. You call 811 before digging; the customer is responsible for marking private lines (irrigation, invisible fence, low-voltage lighting) that 811 does not cover. This one clause prevents the most expensive argument in fencing.
  • Weather delays. Rain and frozen ground move the schedule, not the price.
  • Material price validity. Lumber and vinyl move. "Pricing valid 30 days from the quote date."
  • Hidden conditions. Buried concrete, old footings, tree roots, and rock are priced when found, by change order.
  • HOA and permits. Who is pulling and paying for what.
  • Payment schedule. Deposit up front, balance on completion. Say it plainly.

7. Acceptance

The customer needs one obvious way to say yes. On paper that is a signature line with a printed name and date. Online, a click-wrap accept that records the name, the timestamp, and the IP is stronger evidence than a scanned signature, because it is time-stamped and tamper-evident.

Whichever you use, make it one step. Every extra step between "yes" and recorded-yes loses jobs.

The template, condensed

  1. Business header with license
  2. Customer and job address
  3. Scope paragraph
  4. Itemized lines (runs, gates, tear-out, haul, surcharges, hardware)
  5. Subtotal, markup, tax, total, deposit
  6. Terms (property lines, 811, weather, price validity, hidden conditions, permits, payment)
  7. Acceptance with date

Stop rebuilding it every night

A template is only worth something if you use the same one every time. The moment you are retyping terms into a word processor at 9pm, you will start cutting corners, and the corner you cut will be the clause you needed.

That is the case for letting software hold the template: your rates, your gate prices, and your terms live in one place, and every quote comes out complete and consistent. PicketQuote produces exactly this document, branded to your business, with an online accept built in, in about four minutes.

If you want the pricing math behind the line items, read our fence cost guide and the post on pricing gates properly.